Construction Business Today
Advertisement Banner
  • Home
  • NEWS & ANALYSIS 
    • Infrastructure & Gov. Projects
    • Real Estate & Housing
    • Energy & Sustainability
    • Corporate & Business
    • Policy & Regulations
    • International News
    • Opinions & Editorial
  • Products & Equipment
  • Events & Exhibitions
  • Magazine Archives
  • Contact Us
No Result
View All Result
  • Home
  • NEWS & ANALYSIS 
    • Infrastructure & Gov. Projects
    • Real Estate & Housing
    • Energy & Sustainability
    • Corporate & Business
    • Policy & Regulations
    • International News
    • Opinions & Editorial
  • Products & Equipment
  • Events & Exhibitions
  • Magazine Archives
  • Contact Us
No Result
View All Result
Construction Business Today
No Result
View All Result
Home Infrastructure & Gov. Projects
L&T completes the third mountain tunnel breakthrough for the Mumbai-Ahmedabad Bullet Train project

L&T achieves another major milestone with the successful breakthrough of MT-07 on the Mumbai-Ahmedabad High-Speed Rail corridor.

L&T achieves third mountain tunnel breakthrough for Bullet Train project

Larsen & Toubro (L&T) has achieved another major construction milestone on the Mumbai-Ahmedabad High-Speed Rail (MAHSR) Project with the successful breakthrough of Mountain Tunnel-07 (MT-07) under the C-3 package. The achievement marks the company’s third mountain tunnel breakthrough in Maharashtra within five months, highlighting the steady progress of India’s first Bullet Train corridor.

Located at Ambesari village in Dahanu taluka of Maharashtra’s Palghar district, the MT-07 tunnel has been constructed through the Sahyadri mountain range. The tunnel measures 417 metres in length and 12.6 metres in width, and has been designed to accommodate both up and down high-speed rail tracks.

Excavation was carried out simultaneously from both ends using the New Austrian Tunnelling Method (NATM), enabling continuous geological assessment and the installation of appropriate ground support systems, including shotcrete, rock bolts and lattice girders. The tunnelling work was completed over a period of 516 days using 117 controlled blasts, despite challenging geological conditions.

Advanced monitoring and instrumentation systems were deployed throughout the construction process to ensure structural stability and worker safety. Real-time monitoring through 3D targets, surface settlement points (SSPs) and seismographs enabled engineers to track ground movement, tunnel behaviour and vibration levels with high precision during excavation.

The breakthrough adds to the progress already achieved under the MAHSR project, following the completion of MT-05 and MT-06 earlier this year. With MT-07 now completed, three of the seven mountain tunnels being constructed in Maharashtra have achieved breakthrough, while excavation work on the remaining tunnels continues at various stages. The eighth mountain tunnel, located in Gujarat’s Valsad district, has already been completed.

The MT-07 tunnel forms part of the 135.45-km MAHSR C-3 package being executed by L&T, which extends from Shilphata in Thane to Zaroli village near the Maharashtra-Gujarat border. The package includes three Bullet Train stations at Thane, Virar and Boisar, around 124 km of viaducts constructed using Full Span Launching Method and segmental girders, nearly 2.3 km of steel bridges, seven mountain tunnels spanning approximately 6 km, and around 5 km of specialised earth structures.

The successful completion of the latest tunnel represents another significant engineering achievement for the Mumbai-Ahmedabad Bullet Train Project and reinforces the pace of construction on one of India’s most ambitious transportation infrastructure initiatives.

Tags: Bullet TrainEngineeringHigh Speed RailL&TMAHSRMumbai Ahmedabad High Speed RailNATMRailway InfrastructureTunnel Construction
Next Post
Indian Railways electric locomotive maintenance facility at Raipur under South East Central Railway

Indian Railways approves Rs 175 crore upgrade for electric locomotive maintenance hub in Raipur

Proposed regional airstrip development project in Kerala to improve connectivity across Idukki, Wayanad and Kasaragod

Kerala explores airstrip development in three districts to enhance regional connectivity

Lucknow Development Authority approves Rs 266 crore urban development and civic infrastructure projects

Lucknow sanctions Rs 266 crore urban development plan to boost civic infrastructure

Stay Updated with Latest Construction News

Insights, analysis and updates delivered to your inbox

Construction Business Today Logo

India’s leading media platform for construction news, infrastructure updates, and industry insights.

QUICK LINKS

Home About Us Magazine Events Advertise With Us Contact Us

CATEGORIES

Infrastructure Real Estate Energy Corporate Policy International News Opinions & Editorial

INFORMATION

Privacy Policy Terms & Conditions Disclaimer Sitemap

CONTACT US

B-103, Madhuri Tower – B Wing,
Sector 6, Plot No.1,
Opp Axis Bank,
Airoli, Navi Mumbai – 400708

+91 80803 77266

marketing@volmedia.net

© 2026 Construction Business Today. All Rights Reserved

Powered by
►
Necessary cookies enable essential site features like secure log-ins and consent preference adjustments. They do not store personal data.
None
►
Functional cookies support features like content sharing on social media, collecting feedback, and enabling third-party tools.
None
►
Analytical cookies track visitor interactions, providing insights on metrics like visitor count, bounce rate, and traffic sources.
None
►
Advertisement cookies deliver personalized ads based on your previous visits and analyze the effectiveness of ad campaigns.
None
►
Unclassified cookies are cookies that we are in the process of classifying, together with the providers of individual cookies.
None
Powered by
No Result
View All Result
  • Home
  • NEWS & ANALYSIS 
    • Infrastructure & Gov. Projects
    • Real Estate & Housing
    • Energy & Sustainability
    • Corporate & Business
    • Policy & Regulations
    • International News
    • Opinions & Editorial
  • Products & Equipment
  • Events & Exhibitions
  • Magazine Archives
  • Contact Us

© 2026 Construction Business Today. All Rights Reserved.